Warsaw Riverfront Trails

WARSAW NAMED AS 1 OF 12 BEST COMPLETE STREETS POLICIES IN U.S. 

City of Warsaw has been selected as having one of the 12 Best Complete Streets Policies in the U.S. in 2017. It joins 11 other cities who received the recognition from the National Complete Streets Coalition (NCSC), including Baltimore, MD; Las Cruces, NM; Quebec City, Quebec; Florida, FDOT; Philadelphia, PA; Stonham, MA; Bloomfield, NJ; Bonita Springs; FL; Alexandria, VA; Rochester, NY; and South Bend, IN.

The NCSC wanted to highlight communities around the country that have already taken great strides to address equity and implementation through their Complete Streets initiatives. In its recognition of Warsaw, it further stated that “Despite its small size and limited budget, Warsaw successfully implemented its extensive trail network and kicked off a broader Complete Streets program by using a “three P’s” approach: planning, partnerships, and personnel.

Warsaw developed its 2006 Trail Masterplan through a collaborative planning process between Town staff, community members, and landscape architecture students from Drury University. These groups conducted visioning exercises to develop a rough concept plan for the trail network that engineers later refined. Having an established plan and vision for the entire network made Warsaw more competitive for state and federal grants. The collaborative process got community members excited about the project and gave internal staff clear direction for how to build out its network. Warsaw’s planning efforts also facilitated public and private investment near the trails for everything from historic building restoration projects to new entertainment and recreation facilities.”

According to the NCSC, “To make the waterfront trail network and on-street Complete Streets connections a reality, Warsaw curated strong partnerships with local, state, and federal agencies, including MODOT and the US Army Corps of Engineers. Due to Warsaw’s proximity to the Truman Dam, the Corps of Engineers owns a great deal of waterfront property in and around the town, and they lease many of these properties to Warsaw for its recreational facilities.  These include Warsaw’s golf course, baseball sports complex, mountain bike system, and historic Drake Harbor, all of which connect to the waterfront trail network. The Corps of Engineers was a valuable partner throughout the planning and construction processes by authoring strong letters of endorsement to support grant applications.

MODOT was another instrumental partner in creating on-street connections to the trail network. When MODOT planned to repave State 7 that runs through Warsaw, the town advocated for the addition of buffered bike lanes along the route to extend access to the trail network.

Finally, Warsaw took steps to empower town personnel to get their hands dirty implementing projects on the ground. The town held training for its Parks Department staff to equip them with the skills they’d need to construct and maintain their own trail projects. In addition to building skills, this training shifted the internal culture at Warsaw’s Parks Department by giving staff members a sense of pride and responsibility over these projects and helping them understand the value they bring to the community. The training also made it far easier for the town to fund and implement small-scale projects by providing additional staff time and labor to satisfy grant requirements, and Warsaw saved time and money that might otherwise have been spent on outside contractors.”

CLICK HERE FOR FULL PRESS RELEASE











RIVERFRONT TRAILS

Walk, Run, Bike.....
Enjoy the great outdoors of Warsaw with new "Riverfront Trails". Five (5) miles of waterfront trails along with twenty-one (21) miles family fun trails. Each trail offers different scenic opportunities either by bicycling, walking, running or taking a nice stroll with the dog. These trails are Wheel Chair accessible as well.

The Riverfront Trails include:

  • Drake Harbor & Drake Harbor Trail
  • Steamboat Landing
  • Osage Trail
  • Joe Dice Suspension Bridge
  • Kickapoo Trail
  • Bledsoe Ferry Trail

With multiple connecting trails you can enjoy spending the day exploring all of the trails or maybe one trail per day. 

See great wildlife from the trails like; Eagles, Foxes, Deer and even wild Turkeys....maybe you would like to stop and enjoy a lunch or bird watch from any of the trails....Warsaw Riverfront Trails offers you plenty of ways to explore and have fun. 

Click here to view interactive Riverfront Trail system widget.

CLICK HERE FOR THE PRINTABLE WARSAW RIVERFRONT TRAIL MAP. 

HAVE A GREAT TIME!!

 *For more mountain biking trails see Truman Lake Mountain Bike Park & Hiking Area.

Joe Dice Suspension BridgeBridge East 10 30 15

Drake Harbor Resized_20170812_130658 (003)

Steamboat Landing Boardwalk
Boat

Drake HarborTrail sign_Drake Harbor

Drake Harbor TrailFall time at Drake Harbor Trail

FUNDING  TIMELINE & HOW WE BUILT OUR TRAILS

Drake Harbor Phase I was funded in 1997 with a Missouri Department of Natural Resources (MDNR) recycle grant.  This was the first section of trails to be constructed and was 1000’ in length. The City collected glass bottles that were crushed and used as an aggregate in the asphalt.  

Drake Harbor Recreation Area was funded in 2003 with a Local Landmark Grant from the MDNR.  The funds were used to construct 1470 feet of looping trails around raised soil areas that can accommodate festival tents.  These same areas are used for various outdoor activities.  A future amphitheater was designed into this area.

Joe Dice Suspension Bridge Phase I was federally funded in 2006 with a TEA-21 grant.  The funds were used to structurally improve the entire 660 foot span of the bridge.  This was performed to allow placement of a future permanent deck.

Drake Harbor Phase II was funded in 2010 with a Recreation Trails Program Grant This project extended the Drake Harbor Phase I another 1880 feet around the harbor peninsula to the boat ramps.

Swinging Bridge Trail Phase I was funded in 2010 with a SAFTEA federal grant.  This project construction involved extensive use of soil to create a new gravel trail with a footbridge.  It closed an 1100’ gap in the trail system and made the lighted connection from Drake Harbor Recreation Area to the Joe Dice Suspension Bridge (Swinging Bridge). 

Steamboat Landing Boardwalk was funded with American Recovery and Revitalization Act (ARRA) Enhancement Funds.  This project constructed a 1000 feet of boardwalk with connectivity to boat docks.  Also, includes observation areas.  This is the first phase to a larger Steamboat Landing project.  ARRA MDNR funds were used to replace a sewer main that required a retaining wall to bury the main.  The retaining wall set up the future Steamboat Landing Phase II.

Drake Harbor Phase III was funded in 2011 with a Recreation Trails Program Grant.  This project was 1000 feet in length and linked Drake Harbor Phase II to Steamboat Landing.  This completed the Drake Harbor Recreation Area trails.

Joe Dice Phase II was funded in 2012 with a Special Appropriation. Special lighting for night use was placed along the bridge path.  Additionally, a lighted trailhead with restrooms was constructed.

Osage Amphitheater in Drake Harbor Recreation Area was funded in 2012 with Land, Water and Conservation Funds.  The Amphitheater was connected to the Drake Harbor Recreation Area constructed in 2003.

Steamboat Landing Phase II was funded in 2012 with a Recreation Trails Program Grant.  This project created a middle level trail and upper level parking above the Steamboat Landing Boardwalk.   This includes connections to the boardwalk and upper level parking. With the trial, connecting sidewalks and access to the parking lots, all totaled this is 1800’ of trail improvements all with lights.  The project was a combined bid with the Harrison Street Complete Street project.

Swinging Bridge Trail Final Phase was funded in 2013 with a Recreation Trails Program Grant.  This grant placed a hard surface and lights on the Swinging Bridge Phase I.

Harrison Street Complete Street was funded in 2013 with Transportation Alternative Program Funds (TAP).  This project connected to the Drake Harbor Phase III and Steamboat Landing Phase II.  The project was critical due to the need to make connectivity to the downtown.

Joe Dice Phase III was funded in 2014 with a Recreation Trails Program Grant.  This project placed a very dense hard wood planks for a permanent deck on the bridge.

Bledsoe Ferry Levy Trail was funded in 2014 through the Federal Land Access Program (FLAP).  This project placed a hard surface and lights on a USACE levy.  The project connected the Joe Dice Trailhead to the Bledsoe Ferry Recreation Area.   The length of the project was almost one mile.

Drake Harbor Entrance Road was funded in 2015 through the Federal Land Access Program (FLAP).  This project was a two-part project involving intersection and access improvements to Federal lands.  One part of the project relating to the trail system, was to improve the road access into the harbor by incorporating Complete Street design.

Steamboat Landing Landscape and Amphitheater Connection was funded in 2015 with Land, Water and Conservation Funds.  The project placed a variety of plants along the boardwalk and the midlevel trail.  This portion of the project is complete.  The Amphitheater Connection will provide access to the top of the amphitheater seating from the Drake Harbor Entrance Road project.  This portion of the project will be completed in the spring of 2018.

Osage Trail Phase I was funded in 2017 and will place lights along the trail.  This section of trail will connect to the Steamboat Landing and continue to Highway 65. The project will start in 2019.

View the construction phases of the Riverfront trails from video's above.

RIVERFRONT TRAILS  WILDLIFE

Eagles seen from Bledsoe Ferry Trail

Eagles

Bledsoe Ferry Trail area

IMG_0281

Stop along the trails to see the birds.

rdcard

See beautiful Ducks throughout

IMG_5637

Blue Jay from the Osage Trail

IMG_5431

Blue Herons along the trail banks

IMG_6559

Birds of all colors

IMG_3229

Cool Frogs, and Turtles can be found in channels & back pond areas

FROGGY
We value your input to the Warsaw Riverfront Trails. Please let us know what you think, or should you have any comments and or concerns feel free to contact the City of Warsaw at parksrec@welcometowarsaw.com or call 660 438-5522
Thank You